Assessment reports>Takara Lend Contracts>Audit Results>Assessment Results

Assessment Results

At the time of our assessment, the reviewed code was not deployed to the Sei mainnet.

During our assessment on the scoped Takara Lend contracts, we discovered 11 findings. One critical issue was found. Two were of high impact, one was of medium impact, four were of low impact, and the remaining findings were informational in nature.

Zellic © 2025Back to top ↑