Assessment reports>Facet Bridge>Audit Results>Assessment Results

Assessment Results

At the time of our assessment, the reviewed code was not deployed to facet chain.

During our assessment on the scoped Facet Bridge contracts, we discovered one finding, which was informational in nature.

Zellic © 2025Back to top ↑