Assessment reports>Anzen and protocol-v2>Audit Results>Assessment Results

Assessment Results

At the time of our assessment, the reviewed code was not deployed to Base Mainnet or other networks.

During our assessment on the scoped Anzen and protocol-v2 contracts, we discovered nine findings. No critical issues were found. Three findings were of medium impact, three were of low impact, and the remaining findings were informational in nature.

Zellic © 2025Back to top ↑